Architecture · Large reactors
Large reactors
Configurations for large, site-built power reactors. Each family keeps its own requirements, codes and test sequence in a versioned configuration on top of the shared core.
- Pressurised water reactors
PWR, including VVER
Dual regulatory basis where vendor-country and host-country requirements both apply, bilingual document sets, heat-level traceability for heavy forgings, and the sequence from factory tests to hot functional testing.
In development
- Boiling water reactors
BWR
Configuration for boiling water reactor projects.
Not yet available
- Large gas-cooled reactors
Gas-cooled
Graphite, high-temperature metals and gas-system evidence for large gas-cooled designs.
Planned
- Pressurised heavy water reactors
CANDU / PHWR
Pressure-tube components, heavy-water systems and on-power refuelling equipment.
Planned
01
Why it matters
On a large project a single item can carry requirements from two national systems. If the configuration does not record which requirement came from where, evidence is checked against the wrong criterion.
02 / Licence-holder layer
How does it work in practice?
How the layers are linked, checked and kept consistent is part of the licensed software and is explained to licence holders. Tell us about your project and we will walk you through it.
Ask us how it works03
Have a licence file, a supplier or a work package you are worried about?
Send a short description. We reply within two working days and sign your NDA before any document changes hands.